Grand Avenue Development, Capitola
Project: Underpinning and Slope Stabilization
Client: Crest Residential Development
Location: Capitola, CA
Design Engineer:
Soil Engineering Construction, Inc.
Geotechnical Engineer:
Haro, Kasunich & Associates, Inc.
Contractor:
Soil Engineering Construction, Inc.
Project Description:
The Crest residential development sits at the crest of the coastal bluff located immediately down coast of downtown Capitola. The Owners plan to do a condominium conversion demanded various site improvements to mitigate the detrimental effects of coastal processes. Soil Engineering Construction, Inc., in concert with the Owners geotechnical consultant, developed a plan to design, permit and construct the following: an underpinning system incorporating deeply drilled, reinforced concrete underpinning piers, a slope stabilization system incorporating tieback restrained shear pins with a connecting grade beam, a sea cave fill program incorporating protective anchors to allow the work to proceed safely, and a cut off wall to prevent unmining and the placement of a structural fill.
Deeply drilled underpinning piers
Tieback restrained shear pins
Grade Beam
Sea Cave infill with protective anchors
Placement of structural fill