Opal Cliff Drive, Santa Cruz
Project: Provide long term stability to an existing seawall
Client: Homeowner
Location: Capitola, CA
Design Engineer:
Soil Engineering Construction, Inc.
Contractor:
Soil Engineering Construction, Inc.
Geotechnical Consultant
Project Description:
Years of wave related erosion of the Perisama shelf supporting this 30-year old gravity retaining wall were beginning to undermine it. Soil Engineering Construction, Inc., working with the owner and their coastal consultant (HKA) designed, permitted and implemented the installation of a cutoff trench designed to protect the seawall from undermining. For this project, SEC excavated and placed approximately 200 lineal feet of 24" wide, 6' deep cut off trench along the base of an existing seawall to protect three properties.
Maintain Undercut Seawall with Deep Basel Keyway
Access Tidal Area at Base of Cliff with Heavy Equipment
Remove all Excavated Soil Between Tidal Periods